读知识>英语词典>overhead railway翻译和用法

overhead railway

英 [ˌəʊvəˈhed ˈreɪlweɪ]

美 [ˌoʊvərˈhed ˈreɪlweɪ]

高架铁路

英英释义

noun

双语例句

  • The article introduces in brief the principles of selection of aluminium for parts of the overhead catenary system on electric railway. and how to increase the breaking toughness and decrease the tendency of stress corrosion cracking of the parts by control alloying composition and adjust technology.
    简述了用于高速电气化铁路接触网零件的铝合金的选材原则,介绍了如何通过控制合金成分、调整工艺来提高零件的断裂韧性和减少应力腐蚀开裂倾向。
  • With No. 1 Metro Station, Hu Min overhead road and Elevated Railway, it lines in a convenient traffic net.
    附近有地铁1号线、沪闵高架、内环线高架、轻轨,周边交通十分便捷。
  • The bridge prefabrication and culvert and overhead jack-in of railway are key points for construction of railway overpass bridge and culvert.
    铁路立交桥涵施工重点为桥涵预制和铁路架空顶进,桥涵顶进是立交桥施工质量控制的最重要的一个环节。
  • Overhead contact system detection is significant to manage high speed electrified railway safely.
    接触网检测对于高速电气化铁路安全运营意义重大。
  • The overhead catenary as one of the most important components in the electrified railway, the electric train attains power from contact wire by pantograph, it was frayed because of vibration, distortion, different height to rail and so on.
    接触网作为电气化铁路的重要组成部分,电力机车通过受电弓从接触导线获得电能,由于振动、变形、相对于铁轨高度的不均匀等因素,使接触导线产生磨损。
  • After the pilot plant test, the Government will initiate the investment and construction of mini-carriage overhead railway train in the city.
    中试完成后由政府牵头投资,在城市中实施建设微型车厢高架轨道列车。
  • The design and construction of supporting structure for display screen at overhead floor of Beijing South Railway Station
    北京南站高架层显示屏支撑结构的设计与施工
  • OCS is the most directly correlative overhead equipments for the high-speed railway operate. It makes up by parts of contact hanging supporting structure and load-carrying cable etc. By the development of high-speed railway, the portal structure has gradually become develop trend for OCS supporting structure.
    接触网是高速铁路运营最为直接相关的架空设备,由接触悬挂、支持结构、承力索等部分组成。
  • Overhead Railway Project to Re-Start in Bangkok
    曼谷高架铁路工程将重新启动
  • The overhead catenary is an important part of the railway system, and its fault rate is high as to the working environment.
    接触网是电气化铁路系统的重要组成部分,工作环境十分恶劣,故障率较高。